[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
$1.5 billion: The cost of cutting London-Tokyo latency by 60ms
- Subject: $1.5 billion: The cost of cutting London-Tokyo latency by 60ms
- From: avitkovsky at emea.att.com (Vitkovsky, Adam)
- Date: Fri, 23 Mar 2012 13:53:02 +0100
- In-reply-to: <CAO1bj=ZMk=HRYFLtrO+VMb13W4kZb508LZAyw55C8T2aS0DB-w@mail.gmail.com>
- References: <[email protected]> <CAO1bj=ZMk=HRYFLtrO+VMb13W4kZb508LZAyw55C8T2aS0DB-w@mail.gmail.com>
That is why there's this neutrinos project
It's not faster than the speed of light though it can shoot through the Earth and no cables cost involved
So far the speed is 0.1 bit per sec
Can't wait for the neutrino SFPs :)
adam
-----Original Message-----
From: Aled Morris [mailto:aledm at qix.co.uk]
Sent: Friday, March 23, 2012 1:31 PM
To: Eugen Leitl
Cc: NANOG list
Subject: Re: $1.5 billion: The cost of cutting London-Tokyo latency by 60ms
On 23 March 2012 11:53, Eugen Leitl <eugen at leitl.org> wrote:
> All three cables are being laid for the same reasons: Redundancy and speed.
> As it stands, it takes roughly 230 milliseconds for a packet to go from
> London to Tokyo; the new cables will reduce this by 30% to 170ms. This
> speed-up will be gained by virtue of a much shorter run:
If they could armor the cable sufficiently perhaps they could drill the
straigh line path through the Earth's crust (mantle and outer core) and do
London-Tokyo in less than 10,000km.
Aled