[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
ISDN BRI
- Subject: ISDN BRI
- From: streiner at cluebyfour.org (Justin M. Streiner)
- Date: Thu, 17 Feb 2011 06:46:16 -0500 (EST)
- In-reply-to: <[email protected]>
- References: <[email protected]>
On Thu, 17 Feb 2011, Santino Codispoti wrote:
> Is it possible to order a ISDN BRI line from the LEC and have them
> look at the design of a DS1 and have them if possible design the ISDN
> BRI lineon a devurse path or at lest different equipment within the
> CO?
I suspect that, particularly for something as small (in terms of revenue
to the LEC) as a BRI circuit, you won't have much leverage to ask for
anything 'off the menu', like diverse physical routing through the CO.
When you get to the point of dealing with the copper in the ground/on the
pole, your options for route diversity are usually extremely limited
(read: nonexistent). Telco copper plant is usually based on large
multipair cables from the CO on a specific route, so even if you managed
to get them to commit to diverse routeing in the CO, the copper pairs will
still be in the same cable bundle, entering your building and the CO at
the same points.
jms
- Follow-Ups:
- ISDN BRI
- From: jared at puck.nether.net (Jared Mauch)
- References:
- ISDN BRI
- From: santino.codispoti at gmail.com (Santino Codispoti)