[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Want to move to all 208V for server racks



> There's also a telco oriented 48V inverter rack system thats escaping
> my mind at the moment.  It can be setup with A/B 48V strings, and you
> plug in inverter modules up to IIRC around 8kW.  Not parallel capable
> between racks AFAIK.

48V (and some more when batteries are full) are slightly below the limit 
of non harmfull voltage.

Thus you have a voltage with less power loss at short transports and a 
secure voltage. (creating a short is still not a great idea).

Kind regards,
 	Ingo Flaschberger